Showing posts with label indian navy. Show all posts

PHOTOS: First Ever India-China Naval Exercise

PHOTOS: First Ever India-China Naval Exercise






On completion of the four day visit to Shanghai, INS Shivalik and PLA(N) Ma'anshan conducted passage exercises comprising naval manouevers, communication exercises and cross deck helicopter landings.




Indian Navy to induct new heavy tanker





Strengthening its combat support capabilities, Indian Navy will induct its second Italy-made fleet tanker, INS Shakti, in Vishakhapatnam on October 1.

INS Shakti, the second of the Deepak Class fleet tanker constructed by Italian Fincantieri Shipyard, will be handed over to the Navy on Friday and will be commissioned in operational service on October 1, Navy officials said here.

The first tanker christened INS Deepak was commissioned into the Navy in Mumbai on January 21 this year.

INS Shakti will be the second fleet tanker to be inducted into the Eastern fleet and will help in strengthening combat support operations at sea and extend the reach of the naval power of the nation.

With the induction of the warship, the Navy will have two each fleet tankers on both the seaboards.

Though INS Shakti is essentially a tanker, it is a thoughtfully-designed and versatile platform capable of a large number of roles. In addition to its traditional role of supplying fuel to ships at sea, the ship is also capable of transporting and supplying ammunitions, materials and provisions.

The vessel is also capable of undertaking humanitarian assistance and disaster relief operations with its modern medical health facilities.

The ship is one of the largest vessels of the navy, 175 metres long, 25 metres wide and has a full load displacement of 27,000 tonnes.

The two Deepak class fleet tankers will be the mainstay tankers/ support ships of the Indian Navy in the first half of the 21st century.

Each ship is equipped with four AK-630 guns for close defence supplies and high-tech fire control system supplied by Bharat Electronics Limited.


General characteristics
Class and type:Deepak-class tanker
Displacement:19150 tons(light condition), 27,000 tons ( Maximum)
Length:175 m
Beam:25 m
Draft:9.1 m ( Max )
Depth:19.3 m
Decks:10
Installed power:9.3 MW
Propulsion:Diesel Engines ( 02 ) from MAN and one CPP
Speed:20 knots
Endurance:10000 nm at 20 knots
Complement:180 sailors and 20 officers

india's P-8I nears flight debut






Boeing is close to conducting the first flight of a 737-800-based P-8I maritime patrol aircraft for the Indian navy, with it's first example having emerged at the manufacturer’s Renton Field assembly site in Washington.


Boeing is close to conducting the first flight of a 737-800-based P-8I maritime patrol aircraft for the Indian navy, with it's first example having emerged at the manufacturer’s Renton Field assembly site in Washington.

Photographed by AirSpace user Brandon Farris earlier this month, the aircraft has already been painted in Indian markings and assigned the registration IN320. It is the first of eight P-8Is on order as replacements for the navy’s current Tupolev Tu-142 turboprops. The aircraft was last pictured as it entered final assembly in June.

Derived from the P-8A Poseidon now in development testing for the US Navy, India’s next-generation maritime surveillance aircraft will enter use from early 2013.

India’s examples will differ from the USN’s aircraft through the addition of a belly-mounted radar, which once combined with other sensors will afford the aircraft a 360° surveillance capability against airborne targets.
Another key piece of equipment for the P-8I will be its Raytheon Mk54 lightweight torpedoes. New Delhi signed an $86 million deal in June for an initial 32 of the weapons.

Boeing performed the first flight of a production P-8A for the USN from Renton Field in July. India is the first and so for lone export buyer for the 737 derivative. Test and acceptance activities will be performed from Boeing’s Seattle Field site in Washington.

INS Vikramaditya Aircraft Carrier Is 85% completed





Work on Indian Navy's aircraft carrier INS Vikramaditya is 85 per cent complete and it is set to enter the sea next month for trials.

A high level Indian Navy delegation led by Vice Admiral Niranjan Kumar, which visited Russia’s Sevmash shipyard to inspect the refurbishing work on the naval vessel, has “expressed satisfaction”, the shipyard said.

“The readiness of the ship is already more than 85 percent,” Kumar said, expressing hope that the Russian shipyard would complete the remaining work so that the ship could be commissioned in December 2012.

President of JSC United Shipbuilding Corporation Roman Trotsenko assured that the final stage of modernisation will be conducted with “great care” and with attention to quality.

“Today, the works are on schedule... I am sure that in December 2012, the ship will be delivered to the customer,” the Russian official said.

The Russian craft, named Admiral Gorshkov, which India is buying at a cost of around $2.33 billion, began mooring trials in March this year.

The 45,000-tonne warship is expected to be commissioned in the Indian Navy by 2012 or early 2013 and will be rechristened as INS Vikramaditya.

Meanwhile, a team of Indian Navy personnel which was in St. Petersburg, Russia has completed a six-month training on the refurbished vessel. The first group of 152 sailors and officers had begun their training in April.

A second batch of personnel would arrive in Russia next month to receive training, the shipyard said, adding that more than 1000 crew members will be trained by 2012.

CAG raps Indian Navy For Buying R-77 Missile





The Comptroller and Auditor General (CAG) in its report slammed the Ministry of Defence and the Navy for buying war planes that do not have weapons. It also pointed a finger at the Indian Air Force (IAF) for having ‘let off’ three of its officers who caused a loss of Rs 302 crore when a sensitive aerostat radar got damaged.
 
The CAG, in its report tabled in both Houses of Parliament, said the Indian Navy followed a flawed approach in acquiring its fighter aircraft fleet by not finalising the associated weapon package. The CAG said that 11 out of 16 MiG 29K aircraft, acquired at a cost of $740.35 million (Rs 3,405.61 crore), been delivered in December 2009 and May 2011. No matching armament, for which a contract was signed in March 2006, has been delivered as on October 2010, thereby adversely affecting the operational capabilities of the aircraft.
Further, the Navy has selected a ‘beyond visual range’ (BVR) missile with an unsatisfactory track record. Lastly, the complete armament package finalised for the aircraft contains certain ammunition, worth $20.98 million (Rs 93.68 crore) which did not have the approval of the competent authority.
The MiG 29K is a deck-based fighter meant for seaborne aircraft carrier INS Vikramaditya (Admiral Gorshkov). At present, the fighters are based at a land base in Goa as the aircraft carrier itself has not arrived.
The agreement was signed under an Inter-Governmental Agreement (IGA) between India and Russia in October 2000 for the procurement of an aircraft carrier along with the MiGs for onboard operations. The Ministry of Defence in January 2004 concluded a contract with Russian Aircraft Corporation (RAC-MIG) for procurement of the MiG 29K aircraft. The weapons package was postponed and de-linked from the negotiations for the aircraft.